Endpoint
Signage players
Confirm which players/endpoints participate in the workflow.
Open related area →CAYIN · Content, room signage & reporting
meetingPost+, poster, xPost, SuperReporter 2 and mobile management tools that extend the CAYIN signage workflow.
Technical references
CAYIN · Room Signage Software
CAYIN meetingPost+ Malaysia reference for room signage and booking displays with built-in calendar, Microsoft 365, Google Calendar and Google Workspace integration.
Open technical reference →CAYIN · Content Creation Software
CAYIN poster App Malaysia reference for template-based digital poster creation with customizable text, images, layouts, effects and CAYIN CMS resource scheduling.
Open technical reference →CAYIN · Vertical-Market Signage Software
CAYIN xPost Malaysia reference for web-based vertical-market signage applications including lobbyPost, meetingPost and wayfinderPost for information, events and directions.
Open technical reference →CAYIN · Reporting & Analytics Software
CAYIN SuperReporter 2 Malaysia reference for collecting digital signage playback and system-status logs and generating reports for billing, advertising proof and performance analysis.
Open technical reference →CAYIN · Mobile Management App
CAYIN Signage Assistant Malaysia reference for Android and iOS monitoring and management of compatible CAYIN CMS servers and SMP digital signage networks.
Open technical reference →System dependencies
A product is only one part of the deployment. Confirm the supporting components and infrastructure before final model selection or installation.
Dependency links are planning paths, not automatic compatibility claims. Exact model/SKU, interfaces, loading, firmware/software and accessories must be verified for the final project.
Endpoint
Confirm which players/endpoints participate in the workflow.
Open related area →Management
Confirm the server/management layer required by the selected software workflow.
Open related area →System design
Plan users, network, content and display operations as one system.
Open related area →Selecting for a new project
Use the listed models as the selection path. Exact Malaysia SKU, stock/channel status, warranty terms and accessories should be verified at quotation stage.
Maintaining an installed system
For installed systems, the appropriate path depends on product identification, supportability, compatibility and condition; the outcome may be repair, continued use, phased replacement or migration.
Assess an installed product →