MX2222
12-input pre-amplifier mixer with six mic/line inputs, priority channels, dual paging/BGM outputs and AC/DC operation.
Amperes · Mixers & audio sources
Amperes mixers & audio sources Malaysia reference from PNSS covering MX2222 · MX2322 · audio distribution, system design considerations and project integration guidance.
Why this function matters
The mixer is where microphone, BGM and priority audio are prepared before zone routing and power amplification.
12-input pre-amplifier mixer with six mic/line inputs, priority channels, dual paging/BGM outputs and AC/DC operation.
Current dual-bus pre-amplifier mixer for larger input requirements.
Signal distribution amplifier for routing audio to multiple amplifier paths.
Check the actual rack, speaker loads, line condition, cabling, power and control interfaces before assuming compatibility.
Define normal audio, paging, emergency override, fire-alarm triggers and fallback behavior before finalising the equipment list.
Current Amperes model status, firmware, accessories and project-specific approvals should be verified before formal quotation.
System dependencies
A product is only one part of the deployment. Confirm the supporting components and infrastructure before final model selection or installation.
Dependency links are planning paths, not automatic compatibility claims. Exact model/SKU, interfaces, loading, firmware/software and accessories must be verified for the final project.
Priority
Coordinate programme sources with paging/priority operation.
Open related area →Distribution
Route sources and paging to the required zones.
Open related area →Amplification
Match downstream amplification to the final load design.
Open related area →Selecting for a new project
Use the listed models as the selection path. Exact Malaysia SKU, stock/channel status, warranty terms and accessories should be verified at quotation stage.
Maintaining an installed system
For installed systems, the appropriate path depends on product identification, supportability, compatibility and condition; the outcome may be repair, continued use, phased replacement or migration.
Assess an installed product →Provide the relevant drawings, existing equipment list and required operating sequence.