The Samsung WAFX-P brings display, annotation and selected collaboration functions into one interactive platform. The right decision still depends on how the room will be used, which devices must connect, how accounts are managed and who supports the system after installation.
What is new in WAFX-P
Samsung positions WAFX-P for education and enterprise collaboration. Current official product information highlights Android 15, Google EDLA support, AI-assisted writing and search, a built-in 48MP camera with privacy cover, a microphone pickup range of up to 10 metres, dual 20W speakers with a woofer and up to 50-point multitouch when used with Windows through OPS or an external PC.
Review Samsung’s current product information ↗
Match the display to the room
Start with viewing distance, mounting height, room depth, lighting and the number of simultaneous users. The best diagonal size is the one that remains readable from the back while keeping the active touch area comfortable for the presenter.
- Confirm wall construction, bracket and service access
- Plan power, network, USB, HDMI and cable routing
- Check camera sightline and microphone coverage
- Keep accessibility and seated users in the mounting plan
Design the teaching or meeting workflow
Decide whether users begin from the built-in Android environment, an OPS computer, a connected notebook or a room system. Standardise sign-in, wireless sharing, annotation, file handling and content handover so that different rooms behave consistently.
Plan management, privacy and support
Before deployment, confirm account policy, approved apps, network controls, camera privacy, firmware responsibility and the support route. Record model, serial number, warranty, installed options and configuration for every room.
What PNSS checks before recommending
PNSS reviews the room, display size, mounting, user workflow, connected devices, audio coverage, platform preference, management requirements and lifecycle support before confirming a suitable configuration. Product availability and specifications should always be reconfirmed for Malaysia at quotation stage.

